A) Waste Heat Recovery Boilers
i)2007-08 - 37 Plants of total capacity 458 MW(2374272 MWH)
ii)2008-09 - 33 Plants of total capacity 507 MW(2628288 MWH).
B) Replacement of bulbs with CFLs
i) 2007-08 - 4.3 Lacs of total capacity 17.2 MW
ii) 2008-09 - 4.95 Lacs of total capacity 19.8 MW
C) Replacing conventional tube lights with T5 & T8
i) 2007-08 -19000 Nos of total capacity 0.36MW
ii) 2008-09-21000 Nos of total capacity 0.40MW
D) Energy Savings in Govt./Comml.buildings / Municipal Corporations.
i) 2007-08 – Energy savings of 1.39 MW.(5895 MWH)
ii) 2008-09 – Energy savings of 2.56 MW.(8298 MWH)
D) Energy Savings in industries
Year 2007-08
a) Steel & Power Ltd.,Raigarh
i) 2007-08 - Energy Savings of 6.09 MW(18272 MWH/
38794 KL of Thermal oil Eq).
b) Ultra Tech Cement Ltd. – Distt. Raipur.
i)2007-08 - Energy Savings of 1.82 MW (5474 MWH/67 KL Thermal oil Eq ).
c) B.E.C. Group of Industries – Bhilai.
i) 2007-08 – Energy Savings of 0.92 MW(2758 MWH/ 63 KLThermal oil Eq ).
Year 2008-09
a) Iron & Steel Sector
i) Energy Savings of 3.526 MW (21363 MWH/38857 KL of Thermal oil Eq ).
b) Cement Sector
i)Energy Savings of 6.255 MW (37527 MWH/47889 KL of Thermal oil Eq ).
c) Aluminium & other Industries
i)Energy Savings of 55.3 MW(331771 MWH/6456 KL of Thermal oil Eq ).
d) Railways
i)Energy Savings of 0.230 MW (1390 MWH).
E) Bio-mass Based Power Plants.
i) 2007-08 - 17 Plants of total capacity 139.49 MW
ii) 2008-09 - 17 Plants of total capacity 139.49 MW
F) Bio-mass cogeneration
i) 2007-08 - 01 Plant of 6.0 MW.
ii) 2008-09 - 01 Plant of 6.0 MW
H) Coal Washery Project
i) 2007-08 - 02 Plants of total capacity 45MW.
ii) 2008-09 - 02 Plants of total capacity 45MW.
I) Bio-mass Gasifier.
i) 2007-08 - 08 Plants of total capacity 2.1 MWThermal
02 Plants of total capacity 0.33MWelectrical
(Total 22 plants of capacity 2.81 MWe till this year)
ii) 2008-09 - 02 Plants of total capacity 0.6 MWThermal
(Total 24 plants of capacity 3.01 MWe till this year)
J) Rural Village Electrification Programme ( till 31 March)by
Bio-mass gasifier
i) 2007-08 - 03 systems of total cap.0.05 MW.
ii) 2008-09 - 03 systems of total cap.0.05 MW.
Bio-fuel
i) 2007-08 - 06 plants of total cap. 0.065 MW.
ii) 2008-09 - 06 plants of total cap. 0.065 MW.
Solar Photovoltaic Power Plant (SPVPP) & Solar Home Lighting(SHLS) & Solar Street Lighting Systems(SSLS)
i) Upto 2007-08-782 Villages electrified of total cap. 2.29 MW.
(439 Villages thru’ SPVPP & 342 Villages thru’ SHLS & SSLS Totalling 38,546 families benefitted)
ii) Upto 2008-09-873Villages electrified of total cap. 2.56 MW.
(43,005 families benefitted)
L) Community Lighting Systems.(Through SPV till 31 March)
Tribal Hostels
i) 2007-08 - Total 300 Nos. of total Cap. 0.089 MW.
ii) 2008-09- Total 352 Nos. of total Cap. 0.105 MW.
Primary Health Centres
i) 2007-08 - 23 Nos. of total Cap. 0.0069 MW.
ii) 2008-09 - 23 Nos. of total Cap. 0.0069 MW.
Police Stations of Naxal affected area.
i) 2007-08 – 63 Nos. of total Cap. 0.0512 MW.
ii) 2007-08 – 63 Nos. of total Cap. 0.0512 MW
Solar Pumps for Drinking Water/Irrigation
i) 2007-08 - 24 Nos. of total Cap. 0.0408 MW.
ii) 2008-09 - 124 Nos. of total Cap. 0.223 MW.
M) Family Type Bio-gas plants.
i) 2007-08 - Total nos.upto date 23953 of total cap.
28.74 MW
ii) Ii) 2008-09 - Total nos.upto date 26453 of total cap. 31.74 MW
N) Institutional Type Bio-gas Plants.
i) Upto 2007-08 - 23 Nos. of total Cap. 0.47 MW.
ii) Upto 2008-09 - 27 Nos. of total Cap. 0.48 MW.
P) Solar Water Heating Systems.(Litre per day)
i) 2007-08 –1081 Systems installed in 07-08,
(Total capacity till date 4.74 Lacs.LPD Saving energy – 9.48 MW.)
ii) 2008-09 - 1415 Systems installed in 08-09,
(Total capacity till date 6.833 lacs of LPD Saving energy – 13.66 MW.)
|